Crop Growth

Crop Growth

  • Area: 82,387 sqft
  • Dimensions: 75m x 50m x 15.5m
  • Approx. Weight: 94.3 MT
  • Construction time: 45 Days
  • Location Sikandrabad, Uttar Pradesh

Project Description

EPACK Prefab constructed this pre engineered factory building at Sikandrabad, UP. It has a total area of 82,387 sq ft and was done in 45 days.

Additional features – Low and high bay structures, crimped roof monitor, valley gutter.